Topcon Drill Rig
Make | Topcon |
Model | Drill Rig |
Type | 2D Excavator Systems |
How can we help?
Description
Increase drilling efficiency
The DR-53i Drill Rig Indicate System provides navigation assistance, pattern design wizards and visible indicators letting operators know they are at the right spot and angle to start their hole. Design files can be uploaded, or 3D-MC lets the operator manually create or modify hole specifications. Sitelink3D adds additional capabilities including the ability to remotely share files or support the operator when training is needed or the unexpected occurs.
Models
Applications
- Mass Excavation
- Site Work
- Mining
Overview
Benefits
- Reduce surveying time, delays and costs
- Less time spent marking holes and pounding hubs
- Time spent in the cab is more efficient
- File conversion and immediate upload of change orders
- Minimize the need for additional personnel on job site
- Volume calculation can reduce unexpected downtime and increase accuracy of estimates
Features
- Work from predesigned files
- Rectangular grid
- Single or double boom
- Create designs on the fly or via pattern creation wizard Rectangular grid Staggered rows From points Parallel to alignment Automatic hole numbering Depth from design surface
- Automatic hole numbering
- Extending/sliding feeder
- Staggered rows
- Navigation assistance Angle of attack Direction of the feeder Bullseye
- Depth from design surface
- Swing boom
- Remote support and file transfers via Sitelink3D Support Desk
- Bullseye
- Tilting feeder
- Angle of attack
- Parallel to alignment
- From points
- Direction of the feeder
- Support for different configurations: Swing boom Single or double boom Extending/sliding feeder Tilting feeder
Links
Copy Set
Applications
- Mass Excavation
- Site Work
- Mining
Overview
Benefits
- Reduce surveying time, delays and costs
- Less time spent marking holes and pounding hubs
- Time spent in the cab is more efficient
- File conversion and immediate upload of change orders
- Minimize the need for additional personnel on job site
- Volume calculation can reduce unexpected downtime and increase accuracy of estimates